π§© Task Closure Checklist
Please ensure the following checklist is completed before closing any task in Jira.
Adhering to these steps helps maintain code quality, consistency, and traceability across all environments.
β Pre-Closure Requirementsβ
1. π Release Note Updatedβ
- Provide a clear summary of the changes implemented.
- Include the related ticket or change request (CR) reference.
2. π§ͺ Unit Test Report Attachedβ
- Attach the latest unit test report with coverage details.
- Highlight both passed and failed test cases.
3. π§ SonarQube Report Attachedβ
- Include the latest SonarQube analysis report.
- Ensure no critical or blocker issues remain unresolved.
4. π₯ Peer Code Review Completedβ
- Record the reviewerβs name in the Jira task.
- Verify that all review comments have been addressed and resolved.
5. πΏ Branch Merged & Verifiedβ
- Confirm that the Bitbucket branch workflow was correctly followed.
- Ensure code is synced across all environments:
DEV β QC β UAT β PROD.
Please make sure all the above points are reviewed and completed before marking any Jira task as Done.
Your diligence ensures a smooth and high-quality release process.